Drilling Accessories 110mm Front Active Type Water Swivel for Drill Rig

Discover high-performance drilling swivel rigs designed for efficient water well drilling. Durable, reliable, and built for tough conditions. Explore our water swivel rigs today!

浏览次数: 70 次

发布日期:2025-08-02 00:58:43

WhatsApp: +8618929544937

产品详情

格莳国际 工程机械 重卡 农机 汽配

    Growshine International

    Your Premier Partner for Engine Spare Parts

    Factory Direct Sales! We Support Custom Development of All Spare Parts!
    From Pistons and Piston Rings to Bearings and Liners, We Are Your Direct Source Manufacturer.

    Mercedes-Benz Engine Parts Catalog


    No. Brand Product Description Part Numbers
    1 Kolbenschmidt Pistons for OM501LA (e.g., OM541.920) 40448600, 40310600, 40448961, 40448962, 40310960
    2 Kolbenschmidt Piston Rings for OM501LA (e.g., OM541.920) 800032812000
    3 Kolbenschmidt Bearings for OM501LA (e.g., OM541.920) 79229600, 77547600, 79231600, 77548600, 77683600, 79230600
    4 Kolbenschmidt Cylinder Liners for OM501LA (e.g., OM541.920) 89530110, 89594110, 89846110
    5 Kolbenschmidt Water Pumps for OM501LA (e.g., OM541.920) 50005619, 50005628, 20160350201, 20160350100, 20160350200, 20160350110, 20160350210, 20160350211, 20160354100
    6 BF Cylinder Liners for OM501LA (e.g., OM541.920) 20040350011, 20040350012, 20040350013, 20040350021, 20040350100, 40350101
    7 Kolbenschmidt Pistons for OM502LA (e.g., OM542.920) 40448600, 40448961, 40448962, 40448963, 40448964, 40463600, 40443601, 40463961, 40433962, 40463963, 40463964
    8 Kolbenschmidt Piston Rings for OM502LA (e.g., OM542.920) 800032812000, 800072210000
    9 Kolbenschmidt Bearings for OM502LA (e.g., OM542.920) 72858690, 77549600, 77550600, 77592690, 79230600, 79231600, 79232600
    10 Kolbenschmidt Cylinder Liners for OM502LA (e.g., OM542.920) 89530110, 89594110, 89878110, 89879110
    11 Kolbenschmidt Water Pumps for OM502LA (e.g., OM542.920) 50005619, 20160350100755, 20160350100-755
    12 BF Cylinder Liners for OM502LA (e.g., OM542.920) 20040350011, 20040350012, 20040350100, 20040350101, 20160350200755, 20160350200-755, 20160350200829, 20160350200-829, 20160350201829, 20160350201-829, 20160350210829, 20160350210-829, 20160350211829, 20160350211-829, 20160354200731, 20160354200-731, 20160354200829, 20160354200-829
    13 Kolbenschmidt Pistons for OM457LA (e.g., OM457.915) 40742600, 0742960, 99948600, 99948960
    14 Kolbenschmidt Piston Rings for OM457LA (e.g., OM457.915) 800052810000
    15 Kolbenschmidt Bearings for OM457LA (e.g., OM457.915) 77723600, 77739690, 77740690, 77754604, 77754605, 77754614, 77754644, 77813600, 79294600, 79342600
    16 Kolbenschmidt Cylinder Liners for OM457LA (e.g., OM457.915) 89563110
    17 Kolbenschmidt Water Pumps for OM457LA (e.g., OM457.915) 20160345708809, 20160345708-809
    18 BF Cylinder Liners for OM457LA (e.g., OM457.915) 220040345700854, 220040345700-854, 20040345701, 20040345710
    19 Kolbenschmidt Pistons for OM906LA (e.g., OM906.910) 94705600, 94705960, 94706600, 94706960, 94707600, 94707960, 94971600, 94971960, 94972600, 94972960, 9497360094973960, 94973600, 94973960
    20 Kolbenschmidt Piston Rings for OM906LA (e.g., OM906.910) 800037110000
    21 Kolbenschmidt Bearings for OM906LA (e.g., OM906.910) 77539600, 77543690, 77759690, 77824600, 79226600, 79228600, 79350600, 79401600
    22 Kolbenschmidt Cylinder Liners for OM906LA (e.g., OM906.910) 89513190
    23 Kolbenschmidt Water Pumps for OM906LA (e.g., OM906.910) 50005627, 20160390400755, 20160390400-755, 20160390600755, 20160390600-755, 20160390601809, 20160390601-809, 20160390602809, 20160390602-809
    24 BF Cylinder Liners for OM906LA (e.g., OM906.910) 20040390400

    The Burj Khalifa Project (2010)

    The Burj Khalifa, located in Dubai, United Arab Emirates, officially opened in 2010. It stands as the world's tallest building, reaching a height of 828 meters (2,717 feet). The construction of this architectural marvel was a monumental engineering feat, utilizing innovative techniques and materials to overcome the challenges of building at such a scale. The project required over 12,000 workers on-site daily and involved using a specialized self-climbing formwork system to construct the core of the building. The foundation consists of a large concrete mat supported by concrete piles, designed to withstand the immense load of the structure. The completion of the Burj Khalifa showcased global collaboration and advanced engineering capabilities.

    Growshine-Ailin
    Growshine-Ailin

    Growshine International

    WhatsApp me    

    Mobile/WeChat:+86 18929544937
    Mail:cherylzhang@www.growshine.com.cn

    微信 微信
    WhatsApp WhatsApp

    热门推荐

    热门资讯